Function setting of load resistance

Published on: 2025-04-18

Function Setting

ACLT-38100 Function Setting

1. Load power setting: 0-1000KW continuously adjustable, simulating communication equipment of various powers.

2. Load time setting: 0-99 hours continuously adjustable, set according to maintenance needs.

3. Load minimum voltage alarm setting: set according to maintenance needs.

4. Load maximum voltage alarm setting: set according to maintenance needs.

5. Parallel setting function: up to 9 units can be connected in parallel and work at the same time.

6. Built-in storage function: continuously record the test data of the last three hours, simple and convenient operation.

7. Software analysis function: use Chinese Windows operating environment, Chinese culture, graphical and control system, and automatically generate test reports.

Application field

Widely used in communications, civil aviation, banking, securities, railway bureau electrical department and other industries, it is an essential test tool for the acceptance and daily maintenance of various generator projects, and an essential test tool for the acceptance and daily maintenance of UPS equipment projects.

Safety protection

ACLT-38100 safety protection

1. E-STOP emergency stop switch.

2. Detection of three-phase voltage over-high, alarm and automatic shutdown.

3. Detection of three-phase voltage under-low, alarm and automatic shutdown.

4. Two temperature detections, alarm and automatic shutdown.

5. Fan fault detection, alarm and automatic shutdown.

6. With over-current short-circuit protection function, safe and simple operation.

7. The main power consumption components are made of patented materials, without red heat phenomenon, with multiple safety protection measures, effectively ensuring the safety of equipment testing.

  • +86-18262965046
  • live:.cid.73e43b539bbc938
  • lydia@czystech.com